Progress to date

Summer 2024

In summer 2024 we measured the tidal stream flow at the pier head for one lunar cycle using a state of the art Acoustic Doppler Velocimeter (ADV) loaned by Swansea University. These measurements are a vital first step to designing a tidal stream turbine for this location. The tidal measurements are available for all to access here.

Academic Year 2024-25

In the academic year 2024/2025, five Swansea University students conducted their final year project by designing a tidal stream turbine for installation under the pier head.

The picture to the right shows the five students with their poster displayed as part of their final year project, and the poster is shown below.

Summer 2025

In summer 2025 we held a pier walk-down and determined an initial plan for the location of solar panels (with support from Sustain Heating & Renewables) and a wind turbine.

Progress during 2026

During 2026 we have:

  • used a mock up wind turbine to help determine the position (in the above photo a large star is waved from the landing stage – can you see it?)
  • purchased a yacht hydrogenerator to adapt as a tidal steam turbine (the model we have gone for is pictured to the right)
  • held a pre-app meeting with North Somerset Council planning department. This is the first step in establishing what is needed for planning permissions.
Scroll to top